Quiz Summary
0 of 7 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 7 Questions answered correctly
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 7
1. Question
Both the crane operator and the person giving the signals must:
CorrectIncorrect -
Question 2 of 7
2. Question
It is permissible for the crane operator to accept signals from:
CorrectIncorrect -
Question 3 of 7
3. Question
The most important part of any lift is:
CorrectIncorrect -
Question 4 of 7
4. Question
When giving verbal signals the following must be given:
CorrectIncorrect -
Question 5 of 7
5. Question
All directions given to the operator by the signal person must be given from the operator’s direction perspective.
CorrectIncorrect -
Question 6 of 7
6. Question
Having a lift plan that is reviewed before overhead work begins will drastically decrease the risks involved in a lift.
CorrectIncorrect -
Question 7 of 7
7. Question
Match the action to the communication
INSTRUCTIONS:
Drag the action name down to the right of the action image. The area you are dragging to will turn yellow when you are over it.
When dragging an action name to an action image that is below your screen, you have two options:
- Left-click on the action name, and while keeping the left button down, scroll down with the scroll wheel if you have one
- Left-click on the action name and drag it to the bottom of the screen and keep “bumping” against the bottom of the screen to have it scroll down to where you want to drop it.
You can also drag an action name from image to image, in case you dropped an action name on the wrong image.
Sort elements
- Dog Everything
- Emergency Stop
- Extend Boom or Boom Out
- Hoist Slowly
- Lower Boom and Raise Load Line or Boom Down and Raise Load
- Lower Boom or Boom Down
- Lower Load Line or Lower Down
- Raise Boom and Lower Load Line or Boom Up and Lower Load
- Raise Boom or Boom Up
- Raise Hoist Line or Hoist Up
- Retract Boom or Boom In
- Stop
- Swing: Swing Right or Swing Left
- Use Auxiliary Hoist or Use Whipline
- Use Main Hoist
CorrectIncorrect















